• Cars & Vehicles
Cars & Vehicles
Browse by
  • Cars
  • Motorbikes & Scooters
  • Vans
  • Campervans & Motorhomes
  • Caravans
  • Trucks
Discover more in our guides
For Sale
Browse by
Services
Browse by
  • Business & Office
  • Childcare
  • Clothing
  • Computers & Telecoms
  • Entertainment
Property
Browse by
  • For Sale
  • To Rent
  • To Share
Pets
Browse by
  • Birds
  • Cats
  • Dogs
Jobs
Browse by
Community
Browse by
  • Artists & Theatres
  • Classes
  • Events, Gigs & Nightlife

Contact CarStar (Leeds) Limited

CarStar (Leeds) Limited

Posting for 6+ years

71 FORD TRANSIT 350 2.0 EBL 130 BHP L4 X-LONG LEADER PREMIUM DROPSIDE

Knottingley, West Yorkshire

£21,989

(Plus VAT)

CarStar (Leeds) Limited

Posting for 6+ years

See all ads

Contact CarStar (Leeds) Limited

This listing is powered by our dealer network partner, MOTORS. By clicking 'Send message', you agree for us to share your details with the dealership and MOTORS.

Vehicle history

  • Not stolenPass
  • Not scrappedPass
  • Not exportedPass
  • Not Cat A/BPass
  • Not Cat C/DPass
  • Not Cat S/NPass
  • Not importedPass
  • Original number platePass
  • Original colourPass

Our vehicle history check is provided for guidance only. Please check all the details with the seller before purchasing

Want a more accurate HPI report?

Buy the full report for guaranteed data accuracy, outstanding finance, valuation, milage check & VIN match for £9.99 (normally £19.99)

Buy report now

Vehicle history

  • Not stolenPass
  • Not scrappedPass
  • Not exportedPass
  • Not Cat A/BPass
  • Not Cat C/DPass
  • Not Cat S/NPass
  • Not importedPass
  • Original number platePass
  • Original colourPass

Our vehicle history check is provided for guidance only. Please check all the details with the seller before purchasing

Want a more accurate HPI report?

Buy the full report for guaranteed data accuracy, outstanding finance, valuation, milage check & VIN match for £9.99 (normally £19.99)

Buy report now

Vehicle information

Seller Type
Trade
Posted
2 hours ago

Description

Note: The price displayed for this vehicle (£21989.00) is exclusive of VAT.


71 Plate Ford Transit 350 2.0 Ecoblue 130 BHP L4 Extra Long Wheelbase Leader Edition Premium Dropside .. Great Spec Example in Frozen White with 3 x Seats , L4 X-LONG WHEELBASE , Electric Windows , Bluetooth , Power Steering , Remote Central Locking , Plus all usual styling and refinements found in the Great Spec Leader Edition models .. Euro 6 Compliant .. ONLY 1 OWNER , JUST 21000 MILES FROM NEW ! Serviced ! Great Spec , Ready to Go !, OVER 600 VANS IN STOCK ! , OPEN 7 DAYS ! , VANSTAR IS YORKSHIRE#039;S LARGEST VAN CHOICE , WE SPECIALISE IN NO VAT VANS , EURO 6 VANS , CREWCAB - KOMBI VANS and TIPPERS and LUTONS ! .
FINANCE AVAILABLE and PART EXCHANGE WELCOME ! .. PLEASE USE OUR ON-LINE FINANCE APPLICATION AND PX VALUATION FORMS TO GET STARTED. WE WILL ALSO BUY ANY VAN OUTRIGHT , SEE WEBSITE TO OBTAIN ON-LINE VALUATION , WE ARE ALWAYS WANTING VANS ! . OPEN 7 DAYS A WEEK WITH 100#039;S OF 5 STAR CUSTOMER REVIEWS !
BIG CHOICE OF FORD TRANSIT CUSTOM , CONNECT , VW VOLKSWAGEN TRANSPORTER , CRAFTER and CADDY MAXI , VAUXHALL VIVARO , MERCEDES SPRINTER and VITO , RENAULT MASTER
and TRAFIC , CITROEN RELAY and BERLINGO , PEUGEOT BOXER , PARTNER and EXPERT , NISSAN NAVARA , MITSUBISHI L200 , FORD RANGER , TOYOTA HILUX .
WE SPECIALISE IN HIGH SPEC MODELS LIKE LIMITED , SPORT , HIGHLINE , 4MOTION , TREND , SPORTIVE , 4X4 , TAILGATE , LWB , KOMBI , CREWCAB , NO-VAT , NO VAT , BARBARIAN , HIGH ROOF , SPORTLINE , EURO 6 .
, 16in Steel Wheels, 4.2in Monochrome TFT Non-Touch Screen with New SYNC 4 System, Airbags - Driver, Battery - Cold Start -20 Degree C, Black Dual Manual Signal Mirrors, Bottle Holder - Twin 2 litre Bottle Capacity - Facia-Mounted, Bumper - Front Body Colour - Partial, Config Interior Lighting Battery Saver - 10 Minutes, Curve Control, Day-Night Inside Mirror, Daytime Running Lamps, Door Mirror - Manual Adjust - Short Arm, Door Mirrors - Blind Spot Eliminator and Integrated Side Indicator, Driver Large Head - Short Arm Mirror, Drivers 8-Way Seat Adjustable with Armrest, Dual-Circuit Front and Rear Discs with Self-Adjusting Servo-Assistance and ABS, EBA - Emergency Brake Assist, EPAS - Electric Power Assisted Steering, ESP and Hill Launch Assist, Electrically-Operated Front Windows with One-shot Up-down on Drivers Side, Extra Heavy Duty Alternator, Fixed Rear Windows, Ford Easy Fuel Capless Refuelling System with Misfuel Inhibitor, Front Grille - Self Colour, Gearshift Indicator Light, Gearshift Knob - Moulded, Halogen Headlights with Courtesy Delay, Header Courtesy Light, Headlights - Halogen Projector, Headlights - Levelling Control, Headlights - Quad Beam, Headlining - Cab - Moulded, Immobiliser - Safeguard Passive Anti-Theft System - PATS - Insurance-Approved Category 2 Immobiliser, Interior Trim Accent Pack A, LAC - Load Adaptive Control, Less Steel Spare Wheel, Lid Glove Box, Locks - Audio Mislock Feedback - Audible Signal if a Door is Ajar When Locking Activated, Locks - Auto Locking on Drive-Away - Doors Automatically Lock at 8 kmh or 5 mph, Locks - Auto Relocking - Doors Relock after 45 Seconds if no Door is Opened, Locks - Configurable Unlocking - 2-Stage Unlocking, Locks - Key Operated Bonnet Release, Locks - Power Door Deadlocks - Shielded with Strengthened Mountings, Mechanical Parking Brake, MyKey, Overhead Console, Partial Molded Headliner, Power Point - 2 x 12V Located on Instrument Panel and in Stowage Bin, RSC - Roll Stability Control, Rear 2-Way Head Restraint, Rear Axle Alt A, Recirculation Heater - Front, Remote Central Locking with One Key Fob, Roof Marker Lights, Rubber Partial Floor Cover, Seatbelts - 3 Point Diagonal Inertia Reel - All Seats, Selectable Drive Mode, Side Marker Lights, Single Rear Wheels, Steering Column - Rake and Reach Adjustment, Steering Wheel - 4 Spoke Polyurethane, Storage - Drivers Side Storage Compartment on Facia Top, Storage - Front Door Map Pockets, Storage - Underseat Stowage Compartment Under Dual Passenger Seat, Suspension - Front Independent MacPherson Struts -Variable Rate Coil Springs - Stabiliser Bar - Gas-Pressurised Shock Absorbers and Rear Leaf Springs, Tablet Holder, Tinted Glass, Trip Computer, Tyre Repair Kit, Unperforated Cab Back Panel, Vehicle Identification Number - VIN - Visible, Vehicle Maintenance Monitor, Water in Fuel Filter with Sensor, Wheel Covers - Half Caps, Wide Bodyside - Grey Moulding, Wipers - Front Variable-Intermittent with Electric Wash, Frozen White

V5 Registration Document

About Us:
VanStar is currently the UK's largest used van and commercial vehicle retailer, established over 20 years ago with branches in Leeds (Stanningley) and Wakefield (Brotherton) , we have over 600 vans on display and ready to view. Open 7 days a week with nationwide delivery and a huge variety to choose from, we are confident you will find your next van here at VanStar !

All of our stock is carefully handpicked and selected after rigorous checks on ownership, service history, and mileage, with a very high emphasis on quality. We pride ourselves on supplying the best quality vans available in the market.

We have a wide variety of vans, ranging in price from as little as £4,000 for our value vans, through to £60,000 for some of the latest high spec pick-ups and kombi's. We also have the UK's largest stock of No VAT vans and crewcab / kombi family vans ( 5 / 6 seaters ) , with around 300 of these always in stock .

We provide full dealer facilities including part exchange, a range of finance packages and up to 3 years comprehensive warranty for peace of mind and protection.

We have some of the best finance deals in the market with both Hire Purchase and PCP (see finance explained page) available and clearly laid out below each vehicle. You can also use our online finance calculator to adjust the deposit, term and payment to tailor these to suit your budget.

With 1000's of 5 star customer reviews and 20 years experience of buying and selling quality used vehicles across the UK, we are confident you will find the perfect car or van at a great value price with an overall experience you would recommend.

You can expect a warm welcome when we are helping you with your next car or van.

Warranty:
UP TO 3 YEARS WARRANTY AVAILABLE ON ALL MAKES AND MODELS

Terms and Conditions:
PLEASE VISIT OUR WEBSITE OR CALL OUR LEEDS BRANCH ON 0113-2559000 OR OUR WAKEFIELD BRANCH ON 01977-8006000 .

Opening Hours:
Mo: 09:00 AM to 06:30 PM
Tu: 09:00 AM to 06:30 PM
We: 09:00 AM to 06:30 PM
Th: 09:00 AM to 06:30 PM
Fr: 09:00 AM to 06:30 PM
Sa: 09:00 AM to 05:00 PM
Su: 10:00 AM to 04:00 PM

Why buy from us?
* OVER 600 VANS ON DISPLAY ACROSS OUR TWO PREMIER SITES AT LEEDS & WAKEFIELD
* WE SPECIALISE IN NO VAT VANS , KOMBI CREWCAB VANS , EURO 6 VANS & 4WD PICK-UPS
* VISIT OUR WEBSITE FOR OUR FULL RANGE AVAILABLE AND FREE FINANCE ELIGIBILITY CHECKER
* FINANCE APPLICATION FORM .. YES ! .. PART EX VALUATION FORM .. YES !
* UP TO 5 YEARS FINANCE AVAILABLE WITH UP TO 3 YEAR WARRANTY.

Ad ID: 1505857535

VAT number: 842904425

Exact specification may vary from the details on this page. Please contact the seller to reconfirm any details before purchasing. See Terms & Conditions for further information.

Overview

Performance

Running Costs

  • Year
    2021
  • Mileage
    20,000 miles
  • Body Type
    Other
  • Transmission
    Manual
  • Colour
    White
  • Seats
    3
Motors