• Cars & Vehicles
Cars & Vehicles
Browse by
  • Cars
  • Motorbikes & Scooters
  • Vans
  • Campervans & Motorhomes
  • Caravans
  • Trucks
Discover more in our guides
For Sale
Browse by
Services
Browse by
  • Business & Office
  • Childcare
  • Clothing
  • Computers & Telecoms
  • Entertainment
Property
Browse by
  • For Sale
  • To Rent
  • To Share
Pets
Browse by
  • Birds
  • Cats
  • Dogs
Jobs
Browse by
Community
Browse by
  • Artists & Theatres
  • Classes
  • Events, Gigs & Nightlife

Contact Alexsandr

Alexsandr

Posting for 12+ years

0777677XXXX

Pets at Home Medium Dog Crate Travel Set XL Harness Collar 2 Long Leads Bed Yellow Bowl 2 Bags & Rol

Plaistow, London

£75

Posting for 12+ years

|
34 Ads in a year

Contact Alexsandr

0777677XXXX

pets advice logo

PAAG promotes responsible pet advertising to help protect animal welfare. That's why Gumtree works to ensure all of our adverts meet PAAG's advertising standards. Find more information on buying your pet here.

Description

Pets at Home Medium Dog Crate Travel Set XL Harness Collar 2 Long Leads Bed Yellow Bowl 2 Bags & Rolls
For sale is the ultimate, premium all-in-one travel and walking mega-bundle for a dog, featuring high-quality original Pets at Home gear. This is a complete, ready-to-go kit — perfect for owners who want top-tier equipment without the hassle of buying everything separately.
​This set was purchased brand new for a very short period specifically for a friend's pet who was temporarily staying with us. It is no longer needed and is practically unused.
​All walking gear, including the leads, collar, and XL harness, is in absolute mint condition, looking as if it was just taken out of the packaging. There are absolutely no chew marks or signs of wear on any of the items, including the silicone bowl. The plush bed is spotlessly clean, completely fresh, and has been kept in a clean, smoke-free home environment. All zips, clips, and velcro fasteners function perfectly.
​What is included in this complete bundle:
​Pets at Home Medium Fabric Dog Crate – Lightweight, sturdy, and fully collapsible. Folds flat in seconds with secure clip fasteners. Multiple mesh ventilation windows and smooth zipped openings.
​Matching Plush Grey Calming Pet Bed – Super soft, clean, and completely fresh. Fits perfectly inside the crate for maximum travel comfort.
​Pets at Home Premium Walking Harness – Size XL. Heavy-duty, ergonomic, and highly secure body harness with strong metal rings.
​Pets at Home Matching Dog Collar – Sturdy adjustable collar with a secure snap buckle.
​Long Walking Leads (x2) – Two durable long black leads for perfect control and training.
​Yellow Silicone Feeding Bowl (x1) – High-quality collapsible silicone bowl suitable for food or water on the go with a carabiner clip.
​Travel Accessory Pouches (x2) – Two zipped pouches (one vibrant blue, one pink) with strong velcro straps to attach easily to the crate, your belt, or a lead.
​Pet Waste Poop Bags – Two full brand-new rolls included (plenty of bags to start with).
​Exact Crate Dimensions (verified by tape measure):
​Length: 60 cm
​Width: 42 cm
​Height: 42 cm
​Premium Delivery Service across London:
I am offering personal delivery directly to your door anywhere within London for serious buyers with genuine offers. We can arrange a convenient time to bring the full set straight to your house.
​Price: £75 (Sensible offers considered for a quick sale)
E13 ​Collection/Delivery: Personal delivery across London available. Alternatively, collection can be arranged. Cash or bank transfer preferred.

Posted: 1 hour ago

Ad ID: 1513927797

Details

Condition: Good condition
pets advice logo

PAAG promotes responsible pet advertising to help protect animal welfare. That's why Gumtree works to ensure all of our adverts meet PAAG's advertising standards. Find more information on buying your pet here.

Pets