• Cars & Vehicles
Cars & Vehicles
Browse by
  • Cars
  • Motorbikes & Scooters
  • Vans
  • Campervans & Motorhomes
  • Caravans
  • Trucks
Discover more in our guides
For Sale
Browse by
Services
Browse by
  • Business & Office
  • Childcare
  • Clothing
  • Computers & Telecoms
  • Entertainment
Property
Browse by
  • For Sale
  • To Rent
  • To Share
Pets
Browse by
  • Birds
  • Cats
  • Dogs
Jobs
Browse by
Community
Browse by
  • Artists & Theatres
  • Classes
  • Events, Gigs & Nightlife

Contact CarStar (Leeds) Limited

CarStar (Leeds) Limited

Posting for 6+ years

2022 FORD TRANSIT CUSTOM 300 2.0 EBL 105 BHP L2 LONG LEADER EDITION ( AIR CON )

Knottingley, West Yorkshire

£13,989

(Plus VAT)

CarStar (Leeds) Limited

Posting for 6+ years

See all ads

Contact CarStar (Leeds) Limited

This listing is powered by our dealer network partner, MOTORS. By clicking 'Send message', you agree for us to share your details with the dealership and MOTORS.

Vehicle history

  • Not stolenPass
  • Not scrappedPass
  • Not exportedPass
  • Not Cat A/BPass
  • Not Cat C/DPass
  • Not Cat S/NPass
  • Not importedPass
  • Original number platePass
  • Original colourPass

Our vehicle history check is provided for guidance only. Please check all the details with the seller before purchasing

Want a more accurate HPI report?

Buy the full report for guaranteed data accuracy, outstanding finance, valuation, milage check & VIN match for £9.99 (normally £19.99)

Buy report now

Vehicle history

  • Not stolenPass
  • Not scrappedPass
  • Not exportedPass
  • Not Cat A/BPass
  • Not Cat C/DPass
  • Not Cat S/NPass
  • Not importedPass
  • Original number platePass
  • Original colourPass

Our vehicle history check is provided for guidance only. Please check all the details with the seller before purchasing

Want a more accurate HPI report?

Buy the full report for guaranteed data accuracy, outstanding finance, valuation, milage check & VIN match for £9.99 (normally £19.99)

Buy report now

Vehicle information

Seller Type
Trade
Posted
1 hour ago

Description

Note: The price displayed for this vehicle (£13989.00) is exclusive of VAT.


2022 Plate Ford Transit Custom 300 2.0 Ecoblue 105 BHP L2 Long Wheelbase Leader Edition 5dr .. Great Spec Example in Frozen White with 3 Seats , AIR CON , L2 LONG WHEELBASE , UPGRADED 300 WEIGHT SPEC , Electric Windows , Bluetooth , Remote Central Locking , Factory Front and Rear Parking Sensors , Front Fog Lights , Cargo Lining , Bulkhead , Plus all usual styling and refinements found in the Great Spec Leader Edition models .. Euro 6 Compliant .. ONLY 1 OWNER FROM NEW , 76000 Miles , Excellent History ( 3 x Main Dealer Services ! ) .. Great Spec , Physical Stock !, OVER 600 VANS IN STOCK ! , OPEN 7 DAYS ! , VANSTAR IS YORKSHIRE#039;S LARGEST VAN CHOICE , WE SPECIALISE IN NO VAT VANS , EURO 6 VANS , CREWCAB - KOMBI VANS and TIPPERS and LUTONS ! .
FINANCE AVAILABLE and PART EXCHANGE WELCOME ! .. PLEASE USE OUR ON-LINE FINANCE APPLICATION AND PX VALUATION FORMS TO GET STARTED. WE WILL ALSO BUY ANY VAN OUTRIGHT , SEE WEBSITE TO OBTAIN ON-LINE VALUATION , WE ARE ALWAYS WANTING VANS ! . OPEN 7 DAYS A WEEK WITH 100#039;S OF 5 STAR CUSTOMER REVIEWS !
BIG CHOICE OF FORD TRANSIT CUSTOM , CONNECT , VW VOLKSWAGEN TRANSPORTER , CRAFTER and CADDY MAXI , VAUXHALL VIVARO , MERCEDES SPRINTER and VITO , RENAULT MASTER
and TRAFIC , CITROEN RELAY and BERLINGO , PEUGEOT BOXER , PARTNER and EXPERT , NISSAN NAVARA , MITSUBISHI L200 , FORD RANGER , TOYOTA HILUX .
WE SPECIALISE IN HIGH SPEC MODELS LIKE LIMITED , SPORT , HIGHLINE , 4MOTION , TREND , SPORTIVE , 4X4 , TAILGATE , LWB , KOMBI , CREWCAB , NO-VAT , NO VAT , BARBARIAN , HIGH ROOF , SPORTLINE , EURO 6 .
, 15in Steel Wheels, 180 Degree Rear Cargo Check Arms, 2 Interior Grab Handles, 3 Button Key Fob, ABS and ESP Plus, Automatic Headlights - Follow Me Home, Black Dual Manual Signal Mirrors, Black Exterior Door Handle, Black Exterior Mirror Finish, Black Lift-Decklid Exterior Handle, Bottle Holder - Twin 2 litre Bottle Capacity - Facia-Mounted, Bulkhead - Full Steel with Load Through Hatch, Complete Grille with 3 Bars, Configurable Unlocking - Config 1, Courtesy Lights - Header, Daytime Running Lamps, Door Open Tyre Carrier Drop, Doors - Rear Hinged, Doors Auto Re-Locking, Driver Airbag Restraint, Driver Non-Illuminated Sunvisor, Dual Note Electric Horn, ESC - Electronic Stability Programme, Electrically-Operated Front Windows with One Touch Drivers, Embedded Modem, Emergency Brake Light Flashing, Extra Heavy Duty Alternator, Ford Easy Fuel System, Front Active Seat Belts, Front Headlamp Leveling, Front Seat Belts with Pre-Tensioners, Front Seat Pack 7, Front Splash Guard - Mud Flaps, Glovebox Lid, Header Mounted Package Tray, Headlights - Halogen, Headlights - Quad Beam, High Mounted Stop Lamp, Hill Start Assist, Hub Caps, ICE Feature Pack 17, Interior Trim Accent Pack A, Kerbside Side Load Door, Load Compartment - Tie Down Loops x6, Load Compartment Light, Locks - Remote Control Central Locking with One Key Fob, Low Series Cluster, Mechanical Parking Brake, Mini Overhead Console, Molded Gear Shift Knob, Multi Channel Door Entry Remote, Non Locking Wheel Nuts, Partial Body Coloured Front Bumper, Partial Molded Headliner, Passenger Non-Illuminated Sunvisor, Power Assisted Steering, Power Door Deadlocks - Shielded, Rear Bumper - Self Colour, Rear Door Edge Reflector Strip, Rear Splash Guards, Recirculation Heater - Front, Rubber Partial Floor Cover, Seat Belt Reminder System - Drivers and Front Passengers, Seat Belts - 3-Point Diagonal Inertia Reel - All Seats, Spare Wheel - Conventional, Speed Dependent Power Lock Group, Standard Duty Battery, Standard Duty Suspension, Starter Equipment -20 Degrees C, Steering Column - Rake and Reach Adjustment, Steering Wheel - Leader, Storage - Drivers Side Storage Compartment on Facia Top, Storage - Front Door Map Pockets, Storage - Underseat Stowage Compartment, Tinted Glass Complete, Tool Kit, Trip Computer, Two Stage Unlocking, Wide Bodyside - Grey Moulding, Wipers - Front Variable Intermittent, 70mph Fixed Engine Governer, Front Parking Aid, Frozen White

Power-assisted Steering (PAS); V5 Registration Document

About Us:
VanStar is currently the UK's largest used van and commercial vehicle retailer, established over 20 years ago with branches in Leeds (Stanningley) and Wakefield (Brotherton) , we have over 600 vans on display and ready to view. Open 7 days a week with nationwide delivery and a huge variety to choose from, we are confident you will find your next van here at VanStar !

All of our stock is carefully handpicked and selected after rigorous checks on ownership, service history, and mileage, with a very high emphasis on quality. We pride ourselves on supplying the best quality vans available in the market.

We have a wide variety of vans, ranging in price from as little as £4,000 for our value vans, through to £60,000 for some of the latest high spec pick-ups and kombi's. We also have the UK's largest stock of No VAT vans and crewcab / kombi family vans ( 5 / 6 seaters ) , with around 300 of these always in stock .

We provide full dealer facilities including part exchange, a range of finance packages and up to 3 years comprehensive warranty for peace of mind and protection.

We have some of the best finance deals in the market with both Hire Purchase and PCP (see finance explained page) available and clearly laid out below each vehicle. You can also use our online finance calculator to adjust the deposit, term and payment to tailor these to suit your budget.

With 1000's of 5 star customer reviews and 20 years experience of buying and selling quality used vehicles across the UK, we are confident you will find the perfect car or van at a great value price with an overall experience you would recommend.

You can expect a warm welcome when we are helping you with your next car or van.

Warranty:
UP TO 3 YEARS WARRANTY AVAILABLE ON ALL MAKES AND MODELS

Terms and Conditions:
PLEASE VISIT OUR WEBSITE OR CALL OUR LEEDS BRANCH ON 0113-2559000 OR OUR WAKEFIELD BRANCH ON 01977-8006000 .

Opening Hours:
Mo: 09:00 AM to 06:30 PM
Tu: 09:00 AM to 06:30 PM
We: 09:00 AM to 06:30 PM
Th: 09:00 AM to 06:30 PM
Fr: 09:00 AM to 06:30 PM
Sa: 09:00 AM to 05:00 PM
Su: 10:00 AM to 04:00 PM

Why buy from us?
* OVER 600 VANS ON DISPLAY ACROSS OUR TWO PREMIER SITES AT LEEDS & WAKEFIELD
* WE SPECIALISE IN NO VAT VANS , KOMBI CREWCAB VANS , EURO 6 VANS & 4WD PICK-UPS
* VISIT OUR WEBSITE FOR OUR FULL RANGE AVAILABLE AND FREE FINANCE ELIGIBILITY CHECKER
* FINANCE APPLICATION FORM .. YES ! .. PART EX VALUATION FORM .. YES !
* UP TO 5 YEARS FINANCE AVAILABLE WITH UP TO 3 YEAR WARRANTY.

Ad ID: 1504039620

VAT number: 842904425

Exact specification may vary from the details on this page. Please contact the seller to reconfirm any details before purchasing. See Terms & Conditions for further information.

Overview

Performance

Running Costs

  • Year
    2022
  • Mileage
    76,000 miles
  • Body Type
    Other
  • Transmission
    Manual
  • Colour
    White
  • Seats
    3
Motors